Project NameClientsValues (in Crores)RegionStatus / Completion Period
Design & Construction of bridge between Madha and Versova in
K/W and P/N wards.
BMC,Mumbai2029.8Maharashtra36 Months
Design and Construction of Tertiary Treated Water
Conveyance Tunnel from Ghatkopar WwTF to Bhandup WwTF
and further upto Bhandup Complex Package I
BMC,Mumbai3213Maharashtra93 Months
Replacement of 2750 mm dia. Tansa Enlarged main in
Gundavali – Kasheli – Balkum section and Replacement of
2400 mm dia. Vaitarna main in the Gundavali – Kapurbawadi
– MCP – Saddle Tunnel section by providing and laying 3000
mm dia MS Pipeline
BMC,Mumbai992.32Maharashtra24 Months
Construction of secondary access road (0.75 Km) for
emergencies and VIP’s exit for Noida International Airport,
YElIDA & Construction of 30m wide peripheral road from point
H-E-D1-C, (8.00 Km) along Northern and Eastern side
boundary wall of Airport on item rate (percentage) basis”
NHAI239.84Uttar Pradesh24 Months
Design and construction of Tunnel from Yewai Master
Balancing Reservoir to Kasheli Tal. Bhiwandi Dist. Thane.
BMC,Mumbai4315.89Maharashtra73 Months
Widening & strengthening work of Chandauli-Sakaldiha-
Saidpur Road (On SH No.69) into four lane at District
Chandauli in the state of Uttar Pradesh from UP, PWD.
UPPWD292.52Uttar Pradesh18 Months
Widening & strengthening work of Mohansarai Upadhyay
Nagar Chakia Road (On SH No.120) into four/six lane at
District Chandauli in the state of Uttar Pradesh from UP, PWD.
UPPWD205.03Uttar Pradesh18 Months
Development of Four/Six-lane Access Control Expressway
from Design Chainage Km515.00 to Km 528.300(Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km 550.900 to Km 566.520 (domel to Katra Section) on Hybrid Annuity Mode under bharatmala Pariyojna in the UT of J&K (Phase II-Package XVII)
NHAI1547.91Jammu & Kashmir24 Months
Construction of Greenfield Connectivity to Jewar
International Airport from DND – Faridabad – Ballabhagh
Bypass KMP Link – Spur to Delhi Mumbai Expressway on
Hybrid Annuity Mode under Bharatmala Pariyojana in the
State of Uttar Pradesh & Haryana
NHAI1660.5U.P. & Haryana24 Months
Development of 6Lane AC Highway from Ranipur Barsi
Saharanpur Distt. to Adhoya Musalmana Ambala Dist. Shamli
Ambala Sec of Bareilly Ludhiana EC on EPC under Bharatmala Pariyojana Ph-1 in Haryana (Pkg?2)
NHAI859.62Haryana24 Months
Development of Four Laning of Munger to Mirzachauki (NH-80)
section from Kharia village junction to start of existing Bhagalpur
bypass (Design Chainage Km95+580 to Km125+000) (Package 02)
on Hybrid Annuity mode in the state of Bihar.
NHAI902Bihar24 Months
Construction of Six Laning of Naidupeta Junction –
Turpukanupur Section from Km 57+046 to Km 91+927 in the state
of Andhra Pradesh on HAM under Bharatmala Pariyojna Phase-I.
NHAI961.2Andhra Pradesh24 Months
Construction of two no. of ROBs on Dr. E.Moses Road and
Keshavrao Khade Marg near Mahalaxmi Railway Station in G/South Ward. Bid No. 71000159652.
Municipal
Corporation of Greater Mumbai
603.61Maharashtra36 Months
Development of Bundelkhand Expressway Project (Package-II):
From Mahokhar (Dist. Banda) to Kaohari (Dist. Mahoba)
(Km 49+700 to Km 100+000) in the state of Uttar Pradesh on
EPC Basis.
UPEIDA1774.09Uttar Pradesh36 Months
Construction of 4-lane Bangalore-chennai Expressway from
KM 96.000 (Baireddypalle) to Km 127.000 (Bangarupalem) Section
in the State of Andhra Pradesh under Bharatmala on
Hybrid Annuity Mode (Phase II/Package II)
NHAI2007Andhra Pradesh24 Months
Development of Four Laning of Munger to Mirzachauki (NH-
80) section from Rasulpur to Mirzachauki Design Chainage Km.
157+350 to Km. 193+931 (Package 04) on Hybrid Annuity mode
in the state of Bihar.
NHAI892Bihar24 Months
Construction of Eight Lane access controlled Expressway
from Km 3.00 to Km 20.200(Shirsad to Akloli section – Spur of
Vadodara Mumbai Expressway Project) in the state of
Maharashtra on EPC Mode under Bharatmala Pariyojna.
IRCON1246.97Maharashtra18 Months
Upgrading/improvement of Ch.0+000+367 Sector of
Bhedetar-Rabi-Ranke Road ;Contract no. RiDP/337133/
BRR-01/074/75.
MoPIT, Govt of
Nepal
32618541.12Kathmandu,Nepal36 Months
Construction of Uni Directional Khellani Tunnel of length 1.574 Km
& its approach Road from Km 29.030 to Km 31.449 of total length
of 2.419 Km on NH-244 in Union Territory of Jammu &
Kashmir on EC Mode (Pkg -III)
NHIDCL431.28J&K24 Months
Construction of tunnel T-8 (between Km 22+342 to Km
26+508 approx.) with a central evacuation tunnel approx.
1094 m long on Sivok (West Bengal) to Rangpo (Sikkim)
New Single line BG Railway Line Project.
Ircon International
Limited
422.38Bihar30 Months
The Versova Bandra Sea Link Project (VBSLP) :
VBSLP comprises construction of a sea link bridge along the
West coast of Mumbai from Bandra (on South side) at
Bandra-Worli Sea Link (BWSL) to Versova at Nana
Nani Park (on North side) with intermediate connectors at
Juhu Koliwada and Otter’s Club and tolling facilities.
MSRDCL7000Maharashtra60 Months
Review of Survey, Design,drawings,DPR and Construction of
Mathura Package-1 Multi Group of Villages Water Supply
Schemes, District-Mathura(Surface Water) with relevant
works including Commissioning and Operation & Maintenance
for 10 years in the State of Uttar Pradesh)
State Water and
Sanitation Mission (SWSM),
Uttar Pradesh
1919.21Uttar Pradesh18 Months
Review of Survey, Design,drawings,DPR and Construction of
Mathura Package-2 Multi Group of Villages Water Supply
Schemes, District-Mathura(Surface Water) with relevant
works including Commissioning and Operation &
Maintenance for 10 years in the State of Uttar Pradesh)
State Water and
Sanitation Mission (SWSM),
Uttar Pradesh
960.08Uttar Pradesh18 Months
Construction of Acces Controlled Expressway Connector
to Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra
Samruddhi Mahamarg from Jalna to Nanded in the state of
Maharashtra on EPC Mode for Package JNE-01 from
Panshendra KM (-) 0+090 ot Sarwadi (Ner) KM 36+000 (Length -36.09 KM) in Tq. & Distt. Jalna.
MSRDCL2570Maharastra24 Months
Construction of Acces Controlled Expressway Connector
to Hindu Hrudaysamrat
Balasaheb Thackeray Maharashtra Samruddhi Mahamarg
from Jalna to Nanded in the state of Maharashtra on EPC Mode
for Package JNE-02 from KM 36+000 to Sarwadi (Ner) to KM
66+550 Patoda Kh. Tq. Mantha (Length – 30.550 KM) in
Distt. Jalna.
MSRDCL2375Maharastra24 Months
Mumbai Coastal Road North Project- Package- A(Versova
interchange to Bangur Nagar) (Elevated Road) (Chainage:
-0 +000 to Chainage 4+540).
BMC,Mumbai2543Maharastra48 Months
Mumbai Coastal Road North Project-Package ‘F’ (Gorai
Interchange to Dahisar Interchange) (Elevated Road)
Chainage (14 +780 to 18+470).
BMC,Mumbai3084Maharastra48 Months