Roads, Metro & Bridges

CATEGORY

Project

BUDGET

100.000 $

DETAILS

CUSTOMER

Avalon S & C

LOCATION

Dubai

START DATA

21 December 19

DURATION

24 Months

PROJECT SIZE

346 ft

Highways-sub-page

Highways-> The National Highways Authority of India (NHAI) embarked on the National Highway Development Programme to strengthen India’s road infrastructure. This entailed connecting various parts of the country through a web of world-class highways.

The programme envisaged creating a Golden Quadrilateral with vertices at Delhi, Kolkata, Chennai and Mumbai, aside from constructing North-South and East-West Corridors connecting the length and breadth.

The Vision 2020 document of the Planning Commission projects a five-fold growth to the volume of India’s road traffic by year 2020. This will be enabled by over 70,000-km of national highways and 5,000-10,000-kms of four-laned (or more) expressways networking the Metros. State highways and rural roads are also set to see significant improvement. The National Highways Authority of India (NHAI) is engaged in the largest highway project ever undertaken in the history of the country. The Phase I and II of the NHDP will see four-six laning of about 14,279 km of national highways.

Name of Work Clients Values

(In Crores)

Region Status / Completion Period
Design and construction of Tunnel from Yewai Master Balancing Reservoir to Kasheli Tal. Bhiwandi Dist. Thane. BMC,Mumbai 4315.89 Maharashtra 73 Months
Widening & strengthening work of Chandauli-Sakaldiha-Saidpur Road (On SH No.69) into four lane at District Chandauli in the state of Uttar Pradesh from UP, PWD. UPPWD 292.52 Uttar Pradesh 18 Months
Widening & strengthening work of Mohansarai Upadhyay Nagar Chakia Road (On SH No.120) into four/six lane at District Chandauli in the state of Uttar Pradesh from UP, PWD. UPPWD 205.03 Uttar Pradesh 18 Months
Development of Four/Six-lane Access Control Expressway from Design Chainage Km515.00 to Km 528.300(Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km 550.900 to Km 566.520 (domel to Katra Section) on Hybrid Annuity Mode under bharatmala Pariyojna in the UT of J&K (Phase II-Package XVII) NHAI 1547.91 Jammu & Kashmir 24 Months
Construction of Greenfield Connectivity to Jewar International Airport from DND – Faridabad – Ballabhagh Bypass KMP Link – Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojana in the State of Uttar Pradesh & Haryana NHAI 1660.50 U.P. & Haryana 24 Months
Development of 6Lane AC Highway from Ranipur Barsi Saharanpur Distt. to Adhoya Musalmana Ambala Dist. Shamli Ambala Sec of Bareilly Ludhiana EC on EPC under Bharatmala Pariyojana Ph-1 in Haryana (Pkg‐2) NHAI 859.62 Haryana 24 Months
Development of Four Laning of Munger to Mirzachauki (NH-80) section from Kharia village junction to start of existing Bhagalpur bypass (Design Chainage Km95+580 to Km125+000) (Package 02) on Hybrid Annuity mode in the state of Bihar. NHAI 902.00 Bihar 24 Months
Construction of Six Laning of Naidupeta Junction – Turpukanupur Section from Km 57+046 to Km 91+927 in the state of Andhra Pradesh on HAM under Bharatmala Pariyojna Phase-I. NHAI 961.20 Andhra Pradesh 24 Months
Construction of two no. of ROBs on Dr. E.Moses Road and Keshavrao Khade Marg near Mahalaxmi Railway Station in G/South Ward. Bid No. 71000159652. Municipal Corporation of Greater Mumbai 603.61 Maharashtra 36 Months
Construction of Access controlled Nagpur Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the State of Maharashtra on EPC Mode for Package-5, from Km. 217.023 to Km. 259.900 (From village Kinhiraja to village Kenwad) in District Washim. MSRDCL 1620 Maharashta 30 Months
Development of Bundelkhand Expressway Project (Package-I) : From Gonda (Dist. Chitrakoot) to Mahokhar (Dist.Banda) (Km (-) 0+790 to Km 49+700) in the state of Uttar Pradesh on EPC Basis. UPEIDA 1268.60 Uttar Pradesh 36 Months
Development of Bundelkhand Expressway Project (Package-II): From Mahokhar (Dist. Banda) to Kaohari (Dist. Mahoba) (Km 49+700 to Km 100+000) in the state of Uttar Pradesh on EPC Basis. UPEIDA 1245.63 Uttar Pradesh 36 Months
Development of Gorakhpur Link Expressway Project (Package I) From Jaitpur (Dist. Gorakhpur) to Fulwariya (Dist. Ambedkar Nagar) [Km -0+817 to Km 47+500] in the state of Uttar Pradesh on EPC Basis. UPEIDA 1774.09 Uttar Pradesh 36 Months
Construction elevated viaduct from end of Ghaziabad RRTS Station upto EPE crossing (including), elevated viaduct & Ramp for connection in Duhai Depot, including all special spans and two nos. of Elevated RRTS Stations viz. Guldhar and Duhai [excluding Architectural Finishing & roof structure of Station] of Delhi – Meerut Regional Rapid Transport System Corridor. NCRTC 605.56 Uttar Pradesh 30 Months
Construction of Eight Lane divided carriageway starting at Sohna – Gurgaon Road(NH-248A) near Alipur village and ends at Ch.11+461 before KMP Expressway(Ch 0+000 to Ch 18+461) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC mode under Bharatmala Pariyojna in the state of Haryana. (PKG-I) NHAI 1217.22 Haryana 24 Months
Construction of Eight Lane Expressway starting before KMP Expressway and ends at Ch.47+000 near Khanpur Ghati(km 18+500 to Km 47+000) section of Delhi – Vadodara Green Field Alignment (NH-148N) on EPC mode under Bharatmala Pariyojana in the State of Haryana.(PKG-II) NHAI 1094.00 Haryana 24 Months
Construction of 4-lane Bangalore-chennai Expressway from KM 96.000 (Baireddypalle) to Km 127.000 (Bangarupalem) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase II/Package II) NHAI 2007.00 Andhra Pradesh 24 Months
Development of Four Laning of Munger to Mirzachauki (NH-80) section from Rasulpur to Mirzachauki Design Chainage Km. 157+350 to Km. 193+931 (Package 04) on Hybrid Annuity mode in the state of Bihar. NHAI 892.00 Bihar 24 Months
Construction of Eight Lane access controlled Expressway from Km 3.00 to Km 20.200(Shirsad to Akloli section – Spur of Vadodara Mumbai Expressway Project) in the state of Maharashtra on EPC Mode under Bharatmala Pariyojna. IRCON 1246.97 Maharashtra 18 Months
Upgrading/improvement of Ch.0+000+367 Sector of Bhedetar-Rabi-Ranke Road ;Contract no. RiDP/337133/BRR-01/074/75. MoPIT, Govt of Nepal $32618541.12 Kathmandu,Nepal 36 Months
Name of Work Employer Values(In Lacs) Region Completed Date
Development of Bundelkhand Expressway Project (Package-I) : From Gonda (Dist. Chitrakoot) to Mahokhar (Dist.Banda) (Km (-) 0+790 to Km 49+700) in the state of Uttar Pradesh on EPC Basis. UPEIDA 126860 Uttar Pradesh Completed
Development of Bundelkhand Expressway Project (Package-II): From Mahokhar (Dist. Banda) to Kaohari (Dist. Mahoba) (Km 49+700 to Km 100+000) in the state of Uttar Pradesh on EPC Basis. UPEIDA 124563 Uttar Pradesh Completed
Contruction of Access controlled Nagpur – Mumbai Super communication Expressway (Maharashtra Samruddhi Mahamarg) in the State of Maharashtra on EPC mode for Package 6, From Km 259.900 to Km.296.00 (section – Village Belgaon to Village Parda) in District Buldhana. MSRDCL 123650 Maharashtra Completed
Development of “Purvanchal Expressway” (Package-III) from Jaraikala (Dist.Amethi) to Sidhi Ganeshpur (Dist.Sultanpur)(Km 79+900 to Km 121+600) in the State of Uttar Pradesh on EPC Basis UPEIDA 138074 Uttar Pradesh Completed
4-laning of Aligarh-Kanpur section from km 229.000(Design chainage 240.897) to Km 289.00(design chainage 302.108) (Package-III from Kalyanpur-Naviganj) of NH-91 in the state of Uttar Pradesh on HAM Mode under Bhartamala Pariyojna, Tender Cost : 1332.00 Crores. NHAI 133200 Uttar Pradesh Completed
Six laning of Narasannapeta-Ranastalam section of NH -16 (Old NH-5) from Design Km.580.671 (Existing Km 580.700) to design Km. 634.861 (Existing Km 634.000) (Design Length 54.19 Km) in the state of Andhra Pradesh Under NHDP Phase-V on Hybrid Annuity Mode (From NHAI) Tender Cost: 1350 Crores. NHAI 135000 Andhra Pradesh Completed
Development of Delhi-Meerut Expressway from Km.0.000 to km.27.500 including 6/8 laning of NH-24 from km.0.000 to km49.346 (Hapur Bypass) in the state of Delhi and Uttar Pradesh under(Design length -49.346 km) Package-II from existing km 8.360 to existing km.27.740(UP border to Dasna) in the state of Uttar Pradesh-Hybrid Annuity Model(3rd call). NHAI 198900 Uttar Pradesh Completed
Development of Delhi-Meerut Express from km0.000 to km 27.500 including 6/8 laning of NH 24 from km 0.000 to km 49.346 (hapur bypass) in state of Delhi and Package III Six laning from Existing km 27.740 to exiting km.49.346 (Dasna to Hapur) in UP on Hybrid Anuity base (under JV with Chetak Enterprises) NHAI 105760 Delhi / UP Completed
Widening And Strengthening With Paved Shoulder Of Azamgarh Doharighat (Sh-66) From Km 4(500M) To Km 43(800M) Road (Length 39.300 Km) In Distt- Azamagrh. UPPWD, SE Azamgarh Circle, Azamgarh. 13566 Azamgarh Uttar Pradesh Completed
Development / improvement of Balance works of Ranchi Ring Road Section VII(pkg ID RRR-VII) length 23.575 in the state of Jharkhand. Jharkhand Infrastructure Implementation Co. Ltd. 45200 Jharkhand Completed
Four Laning (With Paved Shoulders) Of Muzaffarnagar to Saharanpur Via Deoband Road Section Of Sh-59 In The State Of Uttar Pradesh On Design, Build, Operate, And Transfer Basis. UP State Highways Authority, Lucknow. 75288 Muzaffarnagar,Uttar Pradesh Completed
Upgradation and Maintenance of Gola-Shahjahanpur section of SH-93 from Km 1.280 to Km 58.580 in the State of Uttar Pradesh. CE,UPPWD,EAP,Lucknow 35690 Uttar Pradesh Completed
4-lane Varanasi bypass from km 0.000 (starting point at km 271.300 of NH-56) to km 15.250 (end point at km 11.170 of NH-29) including 4-laning of NH-29 from km 10.700 to km 12.000 in the state of Uttar Pradesh on EPC Mode. NHAI, New Delhi 26109 Varanasi, Uttar Pradesh Completed
Four Lane with paved shoulder of Varanasi-Shaktinagar Road of SH-5A from km.0.00 to km117.65 in the state of Uttar Pradesh on Design,Build, Finance, Operate and Transfer(DBFOT) basis. Uttar Pradesh State Highway Authority.(Under JV with Chetak Enterprises and Patel Engg). 150900 Uttar Pradesh Completed
Six Laning of Barwa Adda Panagarh Project (from km 398.240 to km 521.120) of NH-2 in the state of West Bengal & Jharkhand. IL & FS Transportation Network Ltd. 84500 WB & Jharkhand 2018
Widening & strengthening of Jivnathpur – Kanchanpur – Sikandarpur – Chakiya – Naugarh – Madhupur (SH-97),Varanasi. U.P.P.W.D.(Varanasi) 15125 Uttar Pradesh 2016
Widening & Strengthening of Varanasi – Adalpur – Chunar – Kachwan Road from Km 11.000 to 46.500 (SH74),Mirzapur. U.P.P.W.D.(Mirzapur) 8043 Uttar Pradesh 2016
Widening & Strengthening of Existing two lane to four lane of Bhadohi-Kapsethi-Babatpur State Highway in District Bhadohi & Varanasi(U.P.) U.P.P.W.D.

(Varanasi)

15103 Uttar Pradesh 2016
Construction & Widening of Moradabad-Bareilly Section of NH-24 from Km 236+500 to Km 269+800. IL & FS Transportation Network Ltd. 30400 Uttar Pradesh 2016
Widening & strengthening of Basti, Mehdawal, Kaptanganj, Tamkuhiraj Road(SH84) Km.15.00 to 57.00 U.P.P.W.D.(Basti) 7489 Uttar Pradesh 2015
Design Engineering, Procrure, Construction of Two Laning with paved shoulder of Khagaria-Purnea Section of NH-31 from Km 270.00 to Km 410.00 (140 Km) Punj Lloyd limited 54000 Bihar 2014
Strengthening of Dumariaganj-Dhebrua State Highway no. 76 from 0.000 to 42.000 in the district of Siddharthnagar U.P.P.W.D. (Basti) 7477 Uttar Pradesh 2014
Construction of Approachs, Guide Bund & Protection works of major bridge over river Ghaghra near Chalarighat on Sitapur-Bahraich Road U.P.P.W.D. (Under JV with Oriental Structural Engineers Pvt. Ltd.) 8615 Uttar Pradesh 2013
Widening and Strengthening of Sahadatganj-Nayaghat Road in Ayodhya-Faizabad U.P.P.W.D. 1859 Uttar Pradesh 2012
Widening etc work of Lucknow-Mahmoodabad Road,Kurshi Road,Lucknow U.P.P.W.D. 4141 Uttar Pradesh 2011
Chidambaram Bypass works, Chidambaram – Tamilnadu OSE Pvt. Ltd. (World Bank project) 5674 Tamil Nadu 2010
Construction of Road works of PWD Lucknow – Palia (SH25) (43 Km) U.P.P.W.D. 2153 Uttar Pradesh 2009
Widening and Strengthening of Chaudah Kosi Parikrama Marg in Ayodhya-Faizabad U.P.P.W.D. 1843 Uttar Pradesh 2009
Construction of Lucknow-Palia SH25(CRF) in km160 to 170, km180 to 185 km,191 to 202 and km 217 to 224 km(30km) U.P.P.W.D. 1566 Uttar Pradesh 2009
Construction of R/Wall/Road on right bank of G.H.Canal, Lucknow Lucknow Development Authority 800 Uttar Pradesh 2009
Widening and strengthening of Panch Koshi Parikrama Marg in Ayodhya-Faizabad U.P.P.W.D. 701 Uttar Pradesh 2009
Improvement of Ratangarh – Kishangarh Road HK2 – A RIDCOR project Punj Lloyd Ltd. 7614 Rajasthan 2008
BM/SDBC work for Milkipur-Amaniganj Road, Faizabad U.P.P.W.D. 414 Uttar Pradesh 2005
Construction of Roads under PMGSY Package-5812, Rae Bareli (World Bank Project) R.E.S. 394 Uttar Pradesh 2005
Construction of Roads under PMGSY Package-5814, Rae Bareli (World Bank Project) R.E.S. 349 Uttar Pradesh 2005
Construction of Roads under PMGSY Package-5813, Rae Bareli (World Bank Project) R.E.S. 324 Uttar Pradesh 2005
Construction of Concrete pavement, Drainage, Cable trenches at ICD Dadri CONCOR India Ltd. 330 Uttar Pradesh 2003
Construction of Concrete Pavement, Drainage, Cable Trench, Box Culvert Etc, At ICD Dadri CONCOR India Ltd. 1324 Uttar Pradesh 2003
Site Clearance, earth work in embankment and subgrade, construction of drainage layer and cross drainage works for GT Road Improvment project on NH-2. HCC Ltd. 432 Jharkhand 2002
Construction of Road work for Naini Bridge works at Allahabad (Authority – NHAI) HCC Ltd. 1280 Uttar Pradesh 2001
Construction of Concrete Pavement, Drainage, Cable trench, Box Culvert etc, at ICD Dadri CONCOR India Ltd. 573 Uttar Pradesh 2001

Irrigation