APCO Invites applications from Qualified Passionate Individuals to join us for upcoming and ongoing projects at various locations. For details see the CAREER section.
   
Roads and EPC Work
Ongoing

S.No. Name of Work Employer

Value in (INR Crs)

Region To be completed on
1 Development of Delhi-Meerut Expressway from Km.0.000 to km.27.500 including 6/8 laning of NH-24 from km.0.000 to km49.346 (Hapur Bypass) in the state of Delhi and Uttar Pradesh under(Design length -49.346 km)-Package-II from existing km 8.360 to existing km.27.740(UP border to Dasna) in the state of Uttar Pradesh-Hybrid Annuity Model(3rd call). NHAI New Delhi 1989.00 Uttar Pradesh Sep-19
2 Upgradation Of Mdr No. 66E Haliyapur-Kudebhar (Section From Km 56.000 To Km. 102.356) In District Sultanpur (Package No. P 04B/Upmdrip/2015-16) C.E., U.P. P.W.D., EAP, Lucknow 156.32 Sultanpur, Uttar Pradesh Apr-19
3 Upgradation Of Mdr No. 66E Haliyapur-Kudebhar (Section From Km 0.000 To Km. 49.272) In District Sultanpur (Package No. P 04A/Upmdrip/2015-16). C.E., U.P. P.W.D., EAP, Lucknow 174.64 Sultanpur, Uttar Pradesh Apr-19
4 Widening And Strengthening With Paved Shoulder Of Azamgarh Doharighat (Sh-66) From Km 4(500M) To Km 43(800M) Road (Length 39.300 Km) In Distt- Azamagrh UPPWD, SE Azamgarh Circle, Azamgarh. 135.66

Azamgarh Uttar pradesh

Mar-18
5 Construction Of Rapti Main Canal Including All Earth Work And Pucca Works From Km 0.450 To Km 6.600 In District Shrawasti (U.P.) U.P. Irrigation Dept, S.E. IX Cirrcle, Bahraich, U.P. 144.21 Shrawasti Uttar Pradesh Dec-17
6 Channelisation Of Varuna River Front In Varanasi, UP GMUP Projects Corporation Ltd, Allahabad, UP 170.05 Varanasi, Uttar Pradesh Apr-17
7 Development / improvement of Balance works of Ranchi Ring Road Section VII(pkg ID RRR-VII) length 23.575 in the state of Jharkhand Jharkhand Infrastructure Implementation Co. Ltd. 452.00 Jharkhand Feb-19
8 Development of Delhi-Meerut Express from km0.000 to km 27.500 including 6/8 laning of NH 24 from km 0.000 to km 49.346 (hapur bypass) in state of Delhi and Package III Six laning from Existing km 27.740 to exiting km.49.346 (Dasna to Hapur) in UP on Hybrid Anuity base NHAI (under JV with Chetak Enterprises) 1057.60 Delhi / UP Aug-19
9 4-laning of Meerut Bulandshahar section of NH-235 from km 8.800 (design chainage km 8.800) to km 66.482 (design chainage km 73.512) in the State of Uttar Pradesh under NHDP Phase-IV on hybrid annuity mode-Letter of Award (LOA). NHAI, New Delhi 868.77 Uttar Pradesh Mar-18
10 Four Laning (With Paved Shoulders) Of Muzaffarnagar – Saharanpur Via Deoband Road Section Of Sh-59 In The State Of Uttar Pradesh On Design, Build, Operate, And Transfer Basis UP State Highways Authority, Lucknow 752.88 Muzaffarnagar,Uttar Pradesh Mar-18
11 4-lane Varanasi bypass from km 0.000 (starting point at km 271.300 of NH-56) to km 15.250 (end point at km 11.170 of NH-29)​ including 4-laning of NH-29 from km 10.700 to km 12.000 in the state of Uttar Pradesh on EPC Mode. NHAI, New Delhi 261.09 Varanasi, Uttar Pradesh May-18
12 Restoration of Gandak Canal System including all earth work and pucca work(Except minors) UP irrigation Gorakhpur 221.65 Uttar Pradesh Oct-17
13 Construction Of Rapti Main Canal And It'S Distribution System Including All E/W And Pucca Works Between Km. 60.000 To Km. 80.000 U.P. Irrigation Dept, S.E. ID Cirrcle 306.90 Gonda,Uttar Pradesh Oct-17
14 Six Laning of Barwa Adda Panagarh Project (from km 398.240 to km 521.120) of NH-2 in the state of West Bengal & Jharkhand. IL & FS Transportation Network Ltd. 845.00 WB & Jharkhand Mar-18
15 Construction Of Z-Morh Tunnel Including Approaches On National Highway No. 1 (Srinagar Sonmarg Gumri Road) In The State Of J & K IL & FS Transportation Network Ltd. 1330.84 J & K Jun-20
16 Four Lane with paved shoulder of Varanasi-Shaktinagar Road of SH-5A from km.0.00 to km117.65 in the state of Uttar Pradesh on Design,Build, Finance, Operate and Transfer(“DBFOT”) basis. Uttar Pradesh State Highway Authority.(Under JV with Chetak Enterprises and Patel Engg). 1509.00 Uttar Pradesh Sep-17